Friday, June 21, 2013

BREAKING NEWS: Engineering Library renovation starts soon!

Construction in the Engineering Library begins Wednesday, June 26, and will continue through the summer.
To accommodate our patrons during this time, a temporary circulation area has been set up, and office spaces have been moved to an enclosed study area. The library will remain open through the summer with study areas, computer stations, and other services available for our patrons (summer hours are Monday through Friday, 8 am to 5 pm).

Demolition in Room 201 has begun


The staircase to the mezzanine in Room 201 (formerly Media Services) is being demolished this week and next. Excuse the noise for now.  A new and wider staircase is being planned for this new study area.

Tuesday, June 18, 2013

Room 127 update

The reconstruction of room 127 is well underway with most of the painting completed, some of the electrical having been installed, new carpet arriving, and as you can see the new sound deadening ceiling tiles are being installed. All in all, The Explore Center, the First Year Experience and Transitions Program, Education Abroad spaces will greatly enhance Love Library south!

 

Friday, June 7, 2013

Love Library Construction Noise

Beginning Friday, June 7, there will be considerable noise due to construction in LLS127. We apologize for any inconvenience this may cause. If you have questions, Ask Us!

Monday, June 3, 2013

New Study Space!

Love north 207A and a newly built modular study room are now available. The keys to use the spaces can be checked out in Media Services, located in room 221.